r Solution sewer system
Selected Abstract
High-Rate Wet Weather Solution.(sewer system)
Designed to treat peak flows of 20 mgd, the nation's first ever high-rate clarification (HRC) combined sewer overflow (CSO) treatment facility in Bremerton, Washington, requires only a 15-minute start uptime to begin treating stormwater that often inundates the city's sewer system. By applying ...
July 1, 2001; Public Works
Read the full article with a free-trial membership at HighBeam Research
Related Articles No Results Found.
|